Madhya Bhotekoshi Jalavidhyut Company Limited (MBJCL) is a subsidiary company of Chilime, registered as public company in july 2010.
Madhya Bhotekoshi Jalavidyut Company Limited (MBJCL) is a subsidiary company of Chilime Hydropower Company Limited, registered as public company in july 2010. MBJCL has planned to develop Middle Bhotekoshi Hydroelectric Project (MBKHEP) with an installed capacity of 102 MW in Sindhupalchowk district of Central Development Region.
Tri-partite loan agreement has been signed between EPF, Chilime and MBJCL for debt portion. The equity investment will be made through 51% promoter share and 49% public share. Chilime is a leading company with 37% share.
Type of Project | Run-of-River (ROR) |
Design flow | 50.8 m3/sec |
Gross Head | 235 m |
Headworks | Gated Weir Type with Undersluice and Side Intake |
Desanding Basin Type & Size | Surface, 100 m(l) x 13 m(w) x 8.5 m(h) |
Tunnel Length & Size | 7124 m x 5.7 m(w) x 5.7 m(h) |
Powerhouse Type & Size | Surface Powerhouse 52 m(l) x 15 m(b) x 25.5 m(h) |
Turbine, Unit Capacity | Type, Orientation & Number-Francis, Vertical Axis & 3 Nos. 34 MW |
Generator Unit Capacity & Nos. | 40 MVA & 3 Nos |
Installed Capacity | 102 MW (3 x 34 MW) |
Annual Salable Energy | 542.2 GWh |
Dry Energy | 83.7 GWh |
Wet Energy | 458.5GWh |
Transmission Line Length/ Voltage | 4 km/Single Circuit 220 kV |
Chilime Hydropower Company Limited (Chilime) was incorporated in 1995 with an objective of hydroelectricity generation through optimal utilization of resources within the country. Nepal Electricity Authority (NEA) holds majority ownership with 51% share holding. Remaining 49% shareholding is from general public including 10% equity ownership of local people. Chilime owns and operates 22.1 MW power plant commissioned on August 25, 2003 and located in Rasuwa district, 133 km north of capital city Kathmandu. It sales bulk electricity to NEA at the long term PPA price. The annual energy generation from the plant is about 150 GWh. Chilime has established following three subsidiaries: 1. Rasuwagadhi Hydropower Company Limited. 2. Madhya Bhotekoshi Jalavidhyut Company Limited. 3. Sanjen Jalavidhyut Company Limited. Chilime, through its three subsidiaries, is developing four hydropower projects with aggregate capacity of 270.3 MW.
Visit SiteSanjen Jalavidhyut Company Limited (SJCL) is a subsidiary of Chilime and was incorporated in March 2010 as a public limited company. SJCL has planned to develop two new projects - Sanjen Hydroelectric Project (SHEP) having capacity of 42.5 MW and Sanjen(Upper) Hydroelectric Project (SUHEP) of capacity 14.8 MW in Rasuwa district of Central Development Region. The company will manage the debt requirement of the project from the EPF for which tri-partite loan arrangement has been signed between EPF, Chilime and SJCL.
Visit SiteRasuwagadhi Hydropower Company Limited (RGHPCL) is a subsidiary of Chilime Hydropower Company Limited (CHPCL) and was incorporated in August 2011 as a public limited company. It has planned to develop a new project - Rasuwagadhi Hydroelectric Project (RGHEP) having capacity of 111MW in Rasuwa district of Central Development Region. The cost of the project is estimated to be NRs. 13,684.20 million excluding financial cost. A 50:50 debt-equity structure will be employed for financing this project.
Visit Site